{"id":19902,"date":"2023-11-13T12:45:45","date_gmt":"2023-11-13T17:45:45","guid":{"rendered":"https:\/\/www.eppetroecuador.ec\/?p=19902"},"modified":"2023-11-13T16:50:25","modified_gmt":"2023-11-13T21:50:25","slug":"ep-petroecuador-implementa-estrategias-para-incrementar-la-produccion-equivalente-de-petroleo-en-este-2023-y-tiene-listos-procesos-para-la-nueva-administracion","status":"publish","type":"post","link":"https:\/\/www.eppetroecuador.ec\/?p=19902","title":{"rendered":"<strong>EP Petroecuador implementa estrategias para incrementar la producci\u00f3n equivalente de petr\u00f3leo en este 2023 y tiene listos procesos para la nueva administraci\u00f3n<\/strong>"},"content":{"rendered":"\n<p class=\"has-text-align-right\"><strong>Quito DM, 13 de noviembre de 2023<\/strong><\/p>\n\n\n\n<p class=\"has-text-align-right\"><strong>Bolet\u00edn de prensa<\/strong><\/p>\n\n\n\n<p>Hoy, el Gerente General (s) de EP Petroecuador, Reinaldo Armijos Del Hierro, present\u00f3 el balance de la gesti\u00f3n y las estrategias planteadas para la pr\u00f3xima administraci\u00f3n durante un conversatorio con medios de comunicaci\u00f3n realizado en Quito.<\/p>\n\n\n\n<p>En este espacio, el Titular de EP Petroecuador present\u00f3 ocho estrategias que se aplican para el incremento de la producci\u00f3n petrolera en este 2023, que consisten en: contar con 14 torres de perforaci\u00f3n entre la empresa p\u00fablica y los consorcios, incorporar seis pozos adicionales en el Bloque 31 (Orellana), llegar a los 80.000 barriles en el Campo Sacha (Orellana), recuperar la producci\u00f3n de los Bloques 16 y 67 (Orellana), continuar con el proceso de licitaci\u00f3n para incrementar la producci\u00f3n de gas natural en el Campo Amistad (El Oro), lanzar a licitaci\u00f3n el plan piloto para el aprovechamiento de gas asociado en Cuyabeno (Sucumb\u00edos) y la perforaci\u00f3n del pozo exploratorio Waponi A1R, en el Bloque 21 (Pastaza)  y superar los 410.000 barriles de petr\u00f3leo por d\u00eda en el total de la estatal petrolera.<\/p>\n\n\n\n<p><strong>\u201cContinuamos trabajando en los procesos pendientes y vamos a dejar a la nueva administraci\u00f3n actividades encaminadas que aporten a los objetivos estrat\u00e9gicos que tiene la empresa, por ello estamos listos para la transici\u00f3n. Cada semana emitimos un informe, desde cada \u00e1rea, que lo ponemos en conocimiento del Directorio de EP Petroecuador para analizar las principales necesidades y acciones prioritarias a tomar, adem\u00e1s no estamos firmando nuevos procesos de contrataci\u00f3n\u201d, <\/strong>manifest\u00f3.<\/p>\n\n\n\n<p>En lo que respecta a Comercio Internacional, el Gerente General (s) se\u00f1al\u00f3 que gracias a las acciones en este \u00e1mbito se logr\u00f3 liberar un mayor porcentaje del saldo exportable, por lo cual para este 2024 el 60% estar\u00e1 destinado para el mercado spot y el 40% restante para las ventas a largo plazo. Tambi\u00e9n inform\u00f3 que se adjudic\u00f3 un total de 11\u2019160.000 barriles de crudo a Unipec America INC. con ingresos aproximados de USD 816.6 millones, compa\u00f1\u00eda que present\u00f3 diferenciales de USD \u2013 3.90 para Crudo Oriente y USD -9.50 para Crudo Napo. \u201cestos barriles representan el 55% del total de saldo para el mercado spot y a\u00fan tenemos disponible un 45% que se continuar\u00e1 exportando en estos meses\u201d, expres\u00f3.<\/p>\n\n\n\n<p>As\u00ed mismo dijo que est\u00e1 listo el proceso de importaci\u00f3n de gas natural para suplir la generaci\u00f3n en las termoel\u00e9ctricas y abastecer de manera oportuna la demanda de electricidad en el pa\u00eds. Esta licitaci\u00f3n fue aprobada por el Directorio de la empresa el pasado 9 de noviembre de 2023 y ser\u00e1 cubierta con el presupuesto de la Cuenta de Financiamiento de Derivados Deficitarios (CFDD). La Licitaci\u00f3n se har\u00e1 el pr\u00f3ximo 14 de noviembre con un plazo de provisi\u00f3n de 135 d\u00edas, una vez que se firme el contrato.<\/p>\n\n\n\n<p>Es importante se\u00f1alar que las principales premisas de la actual administraci\u00f3n empresarial est\u00e1n enfocadas en ampliar los controles anticorrupci\u00f3n, identificar las \u00e1reas cr\u00edticas, promover la transparencia y honestidad; fortalecer el tema ambiental y el di\u00e1logo con las comunidades de las zonas de influencia de los proyectos; continuar con los procesos pendientes; avanzar en la exploraci\u00f3n en territorio y offshore y utilizar nuevas tecnolog\u00edas para innovar en EP Petroecuador.<\/p>\n\n\n\n<figure class=\"is-layout-flex wp-block-gallery-1 wp-block-gallery has-nested-images columns-default is-cropped\">\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/5f2fc8ac-7f16-42ad-a5a2-96487f3bf0b7.jpeg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"682\" data-id=\"19910\"  src=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/5f2fc8ac-7f16-42ad-a5a2-96487f3bf0b7-1024x682.jpeg\" alt=\"\" class=\"wp-image-19910\" srcset=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/5f2fc8ac-7f16-42ad-a5a2-96487f3bf0b7-1024x682.jpeg 1024w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/5f2fc8ac-7f16-42ad-a5a2-96487f3bf0b7-300x200.jpeg 300w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/5f2fc8ac-7f16-42ad-a5a2-96487f3bf0b7-768x511.jpeg 768w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/5f2fc8ac-7f16-42ad-a5a2-96487f3bf0b7-1536x1022.jpeg 1536w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/5f2fc8ac-7f16-42ad-a5a2-96487f3bf0b7-24x16.jpeg 24w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/5f2fc8ac-7f16-42ad-a5a2-96487f3bf0b7-36x24.jpeg 36w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/5f2fc8ac-7f16-42ad-a5a2-96487f3bf0b7-48x32.jpeg 48w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/5f2fc8ac-7f16-42ad-a5a2-96487f3bf0b7.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/d3ac7e74-6aaa-4459-948f-3a9f2a89e8a8.jpeg\"><img decoding=\"async\" loading=\"lazy\" width=\"1024\" height=\"680\" data-id=\"19911\"  src=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/d3ac7e74-6aaa-4459-948f-3a9f2a89e8a8-1024x680.jpeg\" alt=\"\" class=\"wp-image-19911\" srcset=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/d3ac7e74-6aaa-4459-948f-3a9f2a89e8a8-1024x680.jpeg 1024w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/d3ac7e74-6aaa-4459-948f-3a9f2a89e8a8-300x199.jpeg 300w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/d3ac7e74-6aaa-4459-948f-3a9f2a89e8a8-768x510.jpeg 768w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/d3ac7e74-6aaa-4459-948f-3a9f2a89e8a8-1536x1020.jpeg 1536w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/d3ac7e74-6aaa-4459-948f-3a9f2a89e8a8-24x16.jpeg 24w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/d3ac7e74-6aaa-4459-948f-3a9f2a89e8a8-36x24.jpeg 36w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/d3ac7e74-6aaa-4459-948f-3a9f2a89e8a8-48x32.jpeg 48w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/d3ac7e74-6aaa-4459-948f-3a9f2a89e8a8.jpeg 1600w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n<\/figure>\n\n\n\n<p><a href=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2023\/11\/FINAL-Balance-de-la-gestion-13-11-2023.pdf\">REVISE AQU\u00cd LA PRESENTACI\u00d3N<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p class=\"excerpt\">Quito DM, 13 de noviembre de 2023 Bolet\u00edn de prensa Hoy, el Gerente General (s) de EP Petroecuador, Reinaldo Armijos Del Hierro, present\u00f3 el balance de la gesti\u00f3n y las estrategias planteadas para la pr\u00f3xima administraci\u00f3n durante un conversatorio con medios de comunicaci\u00f3n realizado en Quito. En este espacio, el Titular de EP Petroecuador present\u00f3 ocho estrategias que se aplican&hellip; <a href=\"https:\/\/www.eppetroecuador.ec\/?p=19902\">Read more &rarr;<\/a><\/p>\n","protected":false},"author":9,"featured_media":19903,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,6],"tags":[],"_links":{"self":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/19902"}],"collection":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=19902"}],"version-history":[{"count":6,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/19902\/revisions"}],"predecessor-version":[{"id":19923,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/19902\/revisions\/19923"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/media\/19903"}],"wp:attachment":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=19902"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=19902"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=19902"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}