{"id":15541,"date":"2022-11-17T16:15:28","date_gmt":"2022-11-17T21:15:28","guid":{"rendered":"https:\/\/www.eppetroecuador.ec\/?p=15541"},"modified":"2022-11-17T16:15:28","modified_gmt":"2022-11-17T21:15:28","slug":"avanzan-procesos-contractuales-de-ep-petroecuador-para-el-incremento-de-produccion-petrolera-y-eliminacion-de-mecheros-en-la-region-amazonica","status":"publish","type":"post","link":"https:\/\/www.eppetroecuador.ec\/?p=15541","title":{"rendered":"Avanzan procesos contractuales de EP Petroecuador para el incremento de producci\u00f3n petrolera y eliminaci\u00f3n de mecheros en la regi\u00f3n amaz\u00f3nica"},"content":{"rendered":"<p style=\"font-weight: 400; text-align: right;\"><strong>Quito D.M., 17 de noviembre de 2022<\/strong><\/p>\n<p style=\"font-weight: 400; text-align: right;\"><strong>Bolet\u00edn de prensa<\/strong><\/p>\n<p style=\"font-weight: 400;\">Hoy se realiz\u00f3 la apertura del sobre n\u00famero dos, correspondiente a las ofertas econ\u00f3micas, de las empresas interesadas en el proceso de <strong>Contrataci\u00f3n de Servicios Espec\u00edficos Integrados con Financiamiento de la Contratista<\/strong> para la Reactivaci\u00f3n de Pozos Cerrados y, Captaci\u00f3n y\/o Industrializaci\u00f3n del Gas Asociado de los campos de EP Petroecuador, en la regi\u00f3n amaz\u00f3nica.<\/p>\n<p style=\"font-weight: 400;\">Este proceso precontractual tiene el objetivo de incrementar la producci\u00f3n petrolera diaria, a trav\u00e9s de la <strong>reactivaci\u00f3n de pozos cerrados por diferentes circunstancias<\/strong>, incorporar pozos \u00a0que generen valor para la estatal, la <strong>eliminaci\u00f3n de mecheros<\/strong>, mediante la captaci\u00f3n del gas asociado su aprovechamiento para la generaci\u00f3n el\u00e9ctrica, o su procesamiento con la instalaci\u00f3n de equipos y nuevas tecnolog\u00edas que reduzcan la contaminaci\u00f3n al ambiente.<\/p>\n<p style=\"font-weight: 400;\">Siguiendo los pasos normativos vigentes, la Comisi\u00f3n de Evaluaci\u00f3n analizar\u00e1 las ofertas para continuar con la licitaci\u00f3n. El primer sobre, referente a solvencia t\u00e9cnica y de capacidad financiera de las empresas interesadas, se abri\u00f3 el pasado 16 de septiembre, tambi\u00e9n de manera p\u00fablica, en la l\u00ednea de transparencia de la petrolera.<\/p>\n<p style=\"font-weight: 400;\">EP Petroecuador suscribir\u00e1 con las empresas que resulten adjudicadas un <strong>contrato de Servicios Espec\u00edfico Integrados con Financiamiento<\/strong>, para el desarrollo de las diferentes actividades, con lo que la inversi\u00f3n econ\u00f3mica estar\u00e1 a cargo del contratista, sin alterar la propiedad de la operaci\u00f3n, que permanece en manos del Estado ecuatoriano.<\/p>\n<p style=\"font-weight: 400;\">La apertura se trasmiti\u00f3 en vivo, v\u00eda Facebook Live.<\/p>\n<p style=\"font-weight: 400;\">EP Petroecuador avanza en el compromiso de incrementar la producci\u00f3n petrolera para beneficio del pa\u00eds, cumpliendo con la legislaci\u00f3n y la normativa vigentes con transparencia.<\/p>\n<p><a href=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown2.jpeg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-15545\" src=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown2-300x200.jpeg\" alt=\"\" width=\"350\" height=\"233\" srcset=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown2-300x200.jpeg 300w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown2-768x512.jpeg 768w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown2-24x16.jpeg 24w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown2-36x24.jpeg 36w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown2-48x32.jpeg 48w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown2.jpeg 1024w\" sizes=\"(max-width: 350px) 100vw, 350px\" \/><\/a>\u00a0 \u00a0 <a href=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown1.jpeg\"><img decoding=\"async\" loading=\"lazy\" class=\"alignnone wp-image-15544\" src=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown1-300x200.jpeg\" alt=\"\" width=\"350\" height=\"233\" srcset=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown1-300x200.jpeg 300w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown1-768x512.jpeg 768w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown1-24x16.jpeg 24w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown1-36x24.jpeg 36w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown1-48x32.jpeg 48w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2022\/11\/Unknown1.jpeg 1024w\" sizes=\"(max-width: 350px) 100vw, 350px\" \/><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p class=\"excerpt\">Quito D.M., 17 de noviembre de 2022 Bolet\u00edn de prensa Hoy se realiz\u00f3 la apertura del sobre n\u00famero dos, correspondiente a las ofertas econ\u00f3micas, de las empresas interesadas en el proceso de Contrataci\u00f3n de Servicios Espec\u00edficos Integrados con Financiamiento de la Contratista para la Reactivaci\u00f3n de Pozos Cerrados y, Captaci\u00f3n y\/o Industrializaci\u00f3n del Gas Asociado de los campos de EP&hellip; <a href=\"https:\/\/www.eppetroecuador.ec\/?p=15541\">Read more &rarr;<\/a><\/p>\n","protected":false},"author":5,"featured_media":15543,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,6],"tags":[],"_links":{"self":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/15541"}],"collection":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15541"}],"version-history":[{"count":3,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/15541\/revisions"}],"predecessor-version":[{"id":15547,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/15541\/revisions\/15547"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/media\/15543"}],"wp:attachment":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15541"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15541"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}