{"id":13138,"date":"2020-09-08T10:07:51","date_gmt":"2020-09-08T15:07:51","guid":{"rendered":"https:\/\/www.petroamazonas.gob.ec\/?p=13138"},"modified":"2020-09-08T10:07:51","modified_gmt":"2020-09-08T15:07:51","slug":"petroamazonas-ep-pone-en-marcha-un-sistema-que-permite-optimizar-el-combustible-en-la-generacion-electrica-con-petroleo-en-los-bloques-12-y-31","status":"publish","type":"post","link":"https:\/\/www.eppetroecuador.ec\/?p=13138","title":{"rendered":"Petroamazonas EP pone en marcha un sistema que permite optimizar el combustible en la generaci\u00f3n el\u00e9ctrica con petr\u00f3leo en los Bloques 12 y 31"},"content":{"rendered":"<p class=\"s5\"><span class=\"s4\"><span class=\"bumpedFont15\">Bolet\u00edn de Prensa 034<br \/>\n<\/span><\/span><\/p>\n<p class=\"s5\"><span class=\"s6\"><span class=\"bumpedFont15\">Francisco de Orellana<\/span><\/span><span class=\"s6\"><span class=\"bumpedFont15\">, 08<\/span><\/span><span class=\"s6\"><span class=\"bumpedFont15\"> de septiembre<\/span><\/span><span class=\"s6\"><span class=\"bumpedFont15\"> de 2020<\/span><\/span><\/p>\n<p class=\"s9\"><strong><span class=\"s8\"><span class=\"bumpedFont15\">Petroamazonas EP pone en marcha un sistema que permite optimizar el combustible en la ge<\/span><\/span><span class=\"s8\"><span class=\"bumpedFont15\">neraci\u00f3n el\u00e9ctrica con petr\u00f3leo<\/span><\/span><span class=\"s8\"><span class=\"bumpedFont15\"> en los Bloques 12 y <\/span><\/span><span class=\"s8\"><span class=\"bumpedFont15\">31<\/span><\/span><\/strong><\/p>\n<p class=\"s11\"><span class=\"s10\"><span class=\"bumpedFont15\">Esta semana, Petroamazonas EP puso en <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">funcionamiento<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\"> en el Bloque 12, Facilidades d<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">e Ed\u00e9n (EPF-B12), Orellana, el Sistema de Mejora de C<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">alidad de crudo para la generaci\u00f3n el\u00e9ctrica. El proyecto tom\u00f3 m\u00e1s de seis meses de trabajo y requiri\u00f3 una inversi\u00f3n total de US<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">D 3,5 millones.<\/span><\/span><\/p>\n<p class=\"s11\"><span class=\"s10\"><span class=\"bumpedFont15\">El sistema incluye la instalaci\u00f3n del separador de producci\u00f3n, un deshidratador electrost\u00e1tico y un <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">desgasificador<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">. En estos equipos se deshidratar\u00e1 por separado el crudo proveniente del campo <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">Pa\u00f1acocha<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">, cuya densidad es de 21,9 \u00a0grados API (<\/span><\/span><span class=\"s12\"><span class=\"bumpedFont15\">American <\/span><\/span><span class=\"s12\"><span class=\"bumpedFont15\">Petroleum<\/span><\/span> <span class=\"s12\"><span class=\"bumpedFont15\">Institute<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\"> por sus siglas en ingl\u00e9s). Estas instalaciones, automatizadas, permiten una mayor eficiencia a trav\u00e9s del uso de una parte del crudo de <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">Pa\u00f1acocha<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">, para la generaci\u00f3n el\u00e9ctrica, lo que fortalece al sistema de energ\u00eda de Petroamazonas EP y lo vuelve m\u00e1s robusto, garantizando so<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">stenibilidad a las operaciones.<\/span><\/span><\/p>\n<p class=\"s11\"><span class=\"s10\"><span class=\"bumpedFont15\">El Gerente General de Petroamazonas EP, Juan Carlos Bermeo Calder\u00f3n, inform\u00f3 que \u201cen el Bloque 12 no se utiliza di\u00e9sel para la generaci\u00f3n el\u00e9ctrica, sino crudo como combustible, por ello, en esta locaci\u00f3n se han instalado 12 generadores con una capacidad total de 80 <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">MW<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">, para cubrir la demanda actual de 60 <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">MW<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">, <\/span><\/span><a name=\"_GoBack\"><\/a><span class=\"s10\"><span class=\"bumpedFont15\">a fin de garantizar la continuidad en la producci\u00f3n de los B<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">l<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">oques 12, <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">31 y <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">la <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">separaci\u00f3n final del cru<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">do proveniente del Bloque 43\u201d. <\/span><\/span><\/p>\n<p class=\"s11\"><span class=\"s10\"><span class=\"bumpedFont15\">A\u00f1adi\u00f3<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">,<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\"> que aco<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">rde el presupuesto del a\u00f1o 2020,<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">\u201cse espera ejecutar USD 42 millones en Bloque 12, inversi\u00f3n que beneficia a tres Bloques que utilizan la estaci\u00f3n Ed\u00e9n <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">Yuturi<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\"> (<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">EFP<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">) para la <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">deshidrataci\u00f3n final de crudo\u201d.<\/span><\/span><\/p>\n<p class=\"s11\"><span class=\"s10\"><span class=\"bumpedFont15\">Los proyectos en el Bloque 12 Ed\u00e9n <\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">Yuturi<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\"> incluyen la ampliaci\u00f3n del cuarto tren de procesamiento de crudo. Actualmente se procesan en esta estaci\u00f3n 90.350 barriles diarios de crudo y con la ampliaci\u00f3n, se espera aumentar la capacidad de procesamien<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">to en 60.000 barriles.<\/span><\/span><\/p>\n<p class=\"s11\"><span class=\"s10\"><span class=\"bumpedFont15\">Es importante resaltar que las tareas de operaci\u00f3n y mantenimiento no se han detenido por la emergencia sanitaria, el compromiso del personal que labora en la empresa ha permitido mant<\/span><\/span><span class=\"s10\"><span class=\"bumpedFont15\">ener los niveles de producci\u00f3n.<\/span><\/span><\/p>\n<p class=\"s11\"><span class=\"s10\"><span class=\"bumpedFont15\">Actualmente la producci\u00f3n del Bloque 12 es de 30.700 barriles por d\u00eda, mientras que la producci\u00f3n en el Bloque 43 llega a 60.000 barriles diarios. La producci\u00f3n total de Petroamazonas EP es de alrededor de 416 mil barriles de crudo equivalentes por d\u00eda.<\/span><\/span><\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"alignnone size-large wp-image-13144\" src=\"https:\/\/www.petroamazonas.gob.ec\/wp-content\/uploads\/2020\/09\/WhatsApp-Image-2020-09-08-at-10.34.06-1024x611.jpeg\" alt=\"\" width=\"750\" height=\"448\" \/><\/p>\n<p>&nbsp;<\/p>\n<p>Jefatura de Comunicaci\u00f3n<\/p>\n","protected":false},"excerpt":{"rendered":"<p class=\"excerpt\">Bolet\u00edn de Prensa 034 Francisco de Orellana, 08 de septiembre de 2020 Petroamazonas EP pone en marcha un sistema que permite optimizar el combustible en la generaci\u00f3n el\u00e9ctrica con petr\u00f3leo en los Bloques 12 y 31 Esta semana, Petroamazonas EP puso en funcionamiento en el Bloque 12, Facilidades de Ed\u00e9n (EPF-B12), Orellana, el Sistema de Mejora de Calidad de crudo&hellip; <a href=\"https:\/\/www.eppetroecuador.ec\/?p=13138\">Read more &rarr;<\/a><\/p>\n","protected":false},"author":5,"featured_media":13145,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,6],"tags":[],"_links":{"self":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/13138"}],"collection":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13138"}],"version-history":[{"count":0,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/13138\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/"}],"wp:attachment":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13138"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13138"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13138"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}