{"id":12819,"date":"2020-03-06T13:05:32","date_gmt":"2020-03-06T18:05:32","guid":{"rendered":"https:\/\/www.petroamazonas.gob.ec\/?p=11718"},"modified":"2020-03-06T13:05:32","modified_gmt":"2020-03-06T18:05:32","slug":"petroamazonas-ep-iniciara-nueva-campana-de-perforacion-en-tambococha-bloque-43-itt","status":"publish","type":"post","link":"https:\/\/www.eppetroecuador.ec\/?p=12819","title":{"rendered":"Petroamazonas EP invertir\u00e1 USD 148 millones en nueva campa\u00f1a de perforaci\u00f3n en Tambococha \u2013 Bloque 43 ITT"},"content":{"rendered":"<p class=\"gmail-s4\"><b><span class=\"gmail-s3\">Quito, 0<\/span><span class=\"gmail-s3\">6<\/span><span class=\"gmail-s3\"> de marzo de 2020<\/span><\/b><\/p>\n<p class=\"gmail-s6\"><b><span class=\"gmail-s3\">BOLET\u00cdN DE PRENSA Nro. <\/span><span class=\"gmail-s3\">08<\/span><\/b><\/p>\n<p class=\"gmail-s6\"><b>Petroamazonas EP invertir\u00e1 USD 148 millones en nueva campa\u00f1a de perforaci\u00f3n en Tambococha \u2013 Bloque 43 ITT<\/b><\/p>\n<p class=\"gmail-s5\"><span class=\"gmail-s8\">Este <\/span><span class=\"gmail-s8\">6<\/span><span class=\"gmail-s8\"> de <\/span><span class=\"gmail-s8\">marzo de 2020<\/span><span class=\"gmail-s8\">, <\/span><span class=\"gmail-s8\">Petroamazonas EP<\/span> <span class=\"gmail-s8\">adjudic\u00f3 <\/span><span class=\"gmail-s8\">un contrato<\/span><span class=\"gmail-s8\"> de p<\/span><span class=\"gmail-s8\">restaci\u00f3n de <\/span><span class=\"gmail-s8\">s<\/span><span class=\"gmail-s8\">ervicios <\/span><span class=\"gmail-s8\">espec\u00edficos i<\/span><span class=\"gmail-s8\">ntegrados para la perforac<\/span><span class=\"gmail-s8\">i\u00f3n y completaci\u00f3n de <\/span><span class=\"gmail-s8\">24 pozos nuevos para las plataformas B y D en Tambococha, Bloque 43- ITT<\/span><span class=\"gmail-s8\">, provincia de Orellana. <\/span><\/p>\n<p class=\"gmail-s5\"><span class=\"gmail-s8\">Los pozos productores nuevos tendr\u00e1n una inversi\u00f3n de alrededor de 148 millones de d\u00f3lares y permitir\u00e1n incrementar la producci\u00f3n en alrededor de 7.500 barriles de petr\u00f3leo por d\u00eda<\/span><span class=\"gmail-s8\"> (<\/span><span class=\"gmail-s8\">BPPD<\/span><span class=\"gmail-s8\">). <\/span><\/p>\n<p class=\"gmail-s5\"><span class=\"gmail-s8\">\u201c<\/span><span class=\"gmail-s8\">Petroamazonas EP, conforme al proceso de optimizaci\u00f3n de recursos que mantiene la empresa, ha logrado ahorrar alrededor de USD. 1,18 millones en comparaci\u00f3n con el precio referencial pre<\/span><span class=\"gmail-s8\">visto para este proceso\u201d indic\u00f3<\/span><span class=\"gmail-s8\"> Juan Carlos Bermeo<\/span><span class=\"gmail-s8\"> Calder\u00f3n<\/span><span class=\"gmail-s8\">, Gerente<\/span><span class=\"gmail-s8\">General de Petroamazonas EP.<\/span><\/p>\n<p class=\"gmail-s5\"><span class=\"gmail-s8\">Para el proceso se recibieron dos ofertas <\/span><span class=\"gmail-s8\">t\u00e9cnico \u2013 econ\u00f3micas<\/span> <span class=\"gmail-s8\">de empresas interesad<\/span><span class=\"gmail-s8\">as en la prestaci\u00f3n del servicio, <\/span><span class=\"gmail-s8\">las que de acuerdo a las pol\u00edticas de transparencia y libre competencia, <\/span><span class=\"gmail-s8\">fueron evaluadas<\/span><span class=\"gmail-s8\">considerando <\/span><span class=\"gmail-s8\">su<\/span><span class=\"gmail-s8\"> propuesta econ\u00f3mica y cumplimiento de los par\u00e1metros t\u00e9cnicos. <\/span><\/p>\n<p class=\"gmail-s5\"><span class=\"gmail-s8\">Las empresas participantes en el proceso fueron<\/span><span class=\"gmail-s8\">:<\/span><span class=\"gmail-s8\">Sinopec<\/span><span class=\"gmail-s8\"> International <\/span><span class=\"gmail-s8\">Petroleum<\/span> <span class=\"gmail-s8\">Service<\/span><span class=\"gmail-s8\"> Ecuador S.A.<\/span><span class=\"gmail-s8\"> y <\/span><span class=\"gmail-s8\">Chuanqing<\/span> <span class=\"gmail-s8\">Drilling<\/span> <span class=\"gmail-s8\">Engineering<\/span> <span class=\"gmail-s8\">Company<\/span> <span class=\"gmail-s8\">Limited<\/span><span class=\"gmail-s8\">CNPC, <\/span><span class=\"gmail-s8\">y a <\/span><span class=\"gmail-s8\">\u00e9sta \u00faltima se adjudic\u00f3<\/span><span class=\"gmail-s8\"> el contrato por <\/span><span class=\"gmail-s8\">cuanto present\u00f3<\/span><span class=\"gmail-s8\"> la oferta econ\u00f3mica m\u00e1s baja. <\/span><\/p>\n<p class=\"gmail-s5\"><span class=\"gmail-s8\">Esta nueva fase de perforaci\u00f3n es fundamental para aumentar progresivamente la producci\u00f3n de petr\u00f3leo planificada para este 2020<\/span><span class=\"gmail-s8\">, estimada<\/span> <span class=\"gmail-s8\">en los <\/span><span class=\"gmail-s8\">4<\/span><span class=\"gmail-s8\">40.9<\/span><span class=\"gmail-s8\">00 barriles <\/span><span class=\"gmail-s8\">equivalentes de petr\u00f3leo <\/span><span class=\"gmail-s8\">promedio<\/span><span class=\"gmail-s8\"> diario anual<\/span><span class=\"gmail-s8\">. <\/span><\/p>\n<p class=\"gmail-s5\"><span class=\"gmail-s8\">El ITT <\/span><span class=\"gmail-s8\">cuenta con reservas y recursos<\/span><span class=\"gmail-s8\"> en m\u00e1s de 1.672 millones de barriles de petr\u00f3leo, lo que lo convierte<\/span><span class=\"gmail-s8\">, hasta el momento,<\/span><span class=\"gmail-s8\"> en el mayor proyecto <\/span><span class=\"gmail-s8\">en la historia de la <\/span><span class=\"gmail-s8\">explotaci\u00f3n petrolera del pa\u00eds.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>Jefatura de Comunicaci\u00f3n<\/p>\n","protected":false},"excerpt":{"rendered":"<p class=\"excerpt\">Quito, 06 de marzo de 2020 BOLET\u00cdN DE PRENSA Nro. 08 Petroamazonas EP invertir\u00e1 USD 148 millones en nueva campa\u00f1a de perforaci\u00f3n en Tambococha \u2013 Bloque 43 ITT Este 6 de marzo de 2020, Petroamazonas EP adjudic\u00f3 un contrato de prestaci\u00f3n de servicios espec\u00edficos integrados para la perforaci\u00f3n y completaci\u00f3n de 24 pozos nuevos para las plataformas B y D&hellip; <a href=\"https:\/\/www.eppetroecuador.ec\/?p=12819\">Read more &rarr;<\/a><\/p>\n","protected":false},"author":5,"featured_media":11723,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,6],"tags":[],"_links":{"self":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/12819"}],"collection":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12819"}],"version-history":[{"count":0,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/12819\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/11723"}],"wp:attachment":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12819"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12819"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12819"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}