{"id":10611,"date":"2021-05-23T11:58:54","date_gmt":"2021-05-23T16:58:54","guid":{"rendered":"https:\/\/www.eppetroecuador.ec\/?p=10611"},"modified":"2021-05-23T11:58:54","modified_gmt":"2021-05-23T16:58:54","slug":"ep-petroecuador-construira-dos-by-pass-uno-para-el-sote-y-otro-para-el-poliducto-en-el-sector-de-san-luis-napo-ante-la-erosion-regresiva-lateral","status":"publish","type":"post","link":"https:\/\/www.eppetroecuador.ec\/?p=10611","title":{"rendered":"EP Petroecuador construir\u00e1 dos by pass: uno para el SOTE y otro para el poliducto, en el sector de San Luis, Napo, ante la erosi\u00f3n regresiva lateral"},"content":{"rendered":"<h6><strong>Quito D.M., 23 de mayo de 2021<\/strong><\/h6>\n<p>Debido a que durante las \u00faltimas horas, se ha acelerado el proceso de erosi\u00f3n regresiva que afecta al sector de San Luis, provincia de Napo, <strong>EP Petroecuador construir\u00e1 en esta zona <em>dos bypass<\/em><\/strong>, uno, para el Sistema de Oleoducto Transecuatoriano (SOTE) y otro para el poliducto Shushufindi \u2013 Quito. Ambos de una longitud de 422 metros cada uno.<\/p>\n<blockquote><p>La decisi\u00f3n fue informada por el Gerente General de EP Petroecuador, Gonzalo Maldonado, quien indic\u00f3 que <em>\u201cestos trabajos tendr\u00e1n una duraci\u00f3n de 21 d\u00edas, con una <strong>inversi\u00f3n estimada de USD 1 mill\u00f3n<\/strong> y se ejecutar\u00e1n de manera emergente, para evitar retrazos y garantizar el transporte del crudo desde la Amazon\u00eda hasta la provincia de Esmeraldas, as\u00ed como el de combustibles desde Shushufindi hasta Quito.\u201d<\/em><\/p><\/blockquote>\n<p>&nbsp;<\/p>\n<h4><strong>Situaci\u00f3n actual<\/strong><\/h4>\n<p>Como resultado del monitoreo diario que realiza EP Petroecuador a los puntos cr\u00edticos en la zona de influencia de la erosi\u00f3n regresiva, se evidenci\u00f3 el avance de este fen\u00f3meno natural de forma lateral con direcci\u00f3n al eje de las tuber\u00edas, en el sector del r\u00edo Piedra Fina 2 (San Luis), lo cual coloca en riesgo los tramos de los ductos, ya que la distancia entre la erosi\u00f3n y la tuber\u00eda se ha acortado.<\/p>\n<p>EP Petroecuador tambi\u00e9n trabaja de manera paralela en la s\u00e9ptima variante del SOTE y en la quinta variante del poliducto, las dos de 2,4 kil\u00f3metros, las cuales representar\u00e1n una <strong>inversi\u00f3n aproximada de USD 5 millones<\/strong>.<\/p>\n<p>Estos <em>bypass<\/em> se construir\u00e1n acorde a especificaciones de dise\u00f1o originales del SOTE y del poliducto, en cumplimento a la normativa legal vigente y est\u00e1ndares internacionales para construcci\u00f3n de oleoductos, cumpliendo adem\u00e1s con los protocolos de bioseguridad ante la pandemia del COVID-19.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-10612 size-large\" src=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/05\/Variante-SOTE-VII-Y-Bypass-759x1024.png\" alt=\"\" width=\"750\" height=\"1012\" srcset=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/05\/Variante-SOTE-VII-Y-Bypass-759x1024.png 759w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/05\/Variante-SOTE-VII-Y-Bypass-222x300.png 222w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/05\/Variante-SOTE-VII-Y-Bypass-768x1037.png 768w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/05\/Variante-SOTE-VII-Y-Bypass-1138x1536.png 1138w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/05\/Variante-SOTE-VII-Y-Bypass-1517x2048.png 1517w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/05\/Variante-SOTE-VII-Y-Bypass-18x24.png 18w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/05\/Variante-SOTE-VII-Y-Bypass-27x36.png 27w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/05\/Variante-SOTE-VII-Y-Bypass-36x48.png 36w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/05\/Variante-SOTE-VII-Y-Bypass.png 2000w\" sizes=\"(max-width: 750px) 100vw, 750px\" \/><\/p>\n<p style=\"text-align: center;\"><iframe loading=\"lazy\" title=\"YouTube video player\" src=\"https:\/\/www.youtube.com\/embed\/neJtGgfpc64\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n","protected":false},"excerpt":{"rendered":"<p class=\"excerpt\">Quito D.M., 23 de mayo de 2021 Debido a que durante las \u00faltimas horas, se ha acelerado el proceso de erosi\u00f3n regresiva que afecta al sector de San Luis, provincia de Napo, EP Petroecuador construir\u00e1 en esta zona dos bypass, uno, para el Sistema de Oleoducto Transecuatoriano (SOTE) y otro para el poliducto Shushufindi \u2013 Quito. Ambos de una longitud&hellip; <a href=\"https:\/\/www.eppetroecuador.ec\/?p=10611\">Read more &rarr;<\/a><\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,6],"tags":[],"_links":{"self":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/10611"}],"collection":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10611"}],"version-history":[{"count":3,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/10611\/revisions"}],"predecessor-version":[{"id":10628,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/10611\/revisions\/10628"}],"wp:attachment":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10611"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10611"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10611"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}