{"id":10227,"date":"2021-03-31T16:03:55","date_gmt":"2021-03-31T21:03:55","guid":{"rendered":"https:\/\/www.eppetroecuador.ec\/?p=10227"},"modified":"2021-03-31T16:03:55","modified_gmt":"2021-03-31T21:03:55","slug":"ep-petroecuador-realizara-la-interconexion-de-la-quinta-variante-con-la-tuberia-del-sote","status":"publish","type":"post","link":"https:\/\/www.eppetroecuador.ec\/?p=10227","title":{"rendered":"EP Petroecuador realizar\u00e1 la interconexi\u00f3n de la quinta variante con la tuber\u00eda del SOTE"},"content":{"rendered":"<h6><strong>Quito, 31 de marzo de 2021<\/strong><\/h6>\n<p><span style=\"color: #666699;\"><strong><em>Para estos trabajos, la empresa p\u00fablica ha invertido USD 10,5 millones en la construcci\u00f3n de seis variantes y un by pass del oleoducto.<\/em><\/strong><\/span><\/p>\n<p>Este 1 de abril, la Empresa P\u00fablica Petroecuador <strong>paralizar\u00e1 las operaciones de bombeo del Sistema de Oleoducto Transecuatoriano (SOTE)<\/strong> por un lapso estimado de 24 horas a partir de las 00h00, para la ejecuci\u00f3n de trabajos de empate de la quinta variante con la tuber\u00eda principal del oleoducto, ubicada entre los r\u00edos M\u00e1rker y Piedra Fina, sector de San Luis, en el l\u00edmite provincial entre Napo y Sucumb\u00edos.<\/p>\n<p>El Gerente General de EP Petroecuador, Gonzalo Maldonado, inform\u00f3 que <em>\u201cesta paralizaci\u00f3n del SOTE <strong>no afectar\u00e1 las operaciones de producci\u00f3n<\/strong>, ya que se ha programado previamente con las diferentes \u00e1reas operativas para que el crudo extra\u00eddo de la Amazon\u00eda sea almacenado hasta que se reinicie el bombeo a trav\u00e9s del oleoducto. De igual forma, las exportaciones petroleras tampoco registrar\u00e1n ning\u00fan cambio en las entregas programadas\u201d<\/em>.<\/p>\n<p>Los trabajos de construcci\u00f3n de la quinta y sexta variante finalizaron exitosamente de acuerdo al cronograma planificado. La quinta variante tiene una extensi\u00f3n aproximada de 603 metros, mientras que la sexta variante es de 763 metros.<\/p>\n<p>De igual forma, Maldonado explic\u00f3 que los trabajos realizados en el SOTE son preventivos, <em>\u201chasta el momento hemos invertido cerca de <strong>USD 10,5 millones para la construcci\u00f3n de seis variantes y un by pass<\/strong>, labores que se han realizado de manera preventiva y que nos permiten alejarnos de la erosi\u00f3n que afecta este sector, estamos precautelando la integridad del oleoducto que es fundamental para la econom\u00eda ecuatoriana\u201d<\/em>.<\/p>\n<p>Durante la ejecuci\u00f3n de los trabajos de construcci\u00f3n de la quinta variante y que contaron con el apoyo del Cuerpo de Ingenieros del Ej\u00e9rcito, se realizaron actividades como: <strong>obras civiles para la liberaci\u00f3n del derecho de v\u00eda, instalaciones de la tuber\u00eda, movimiento de tierras para adecuaci\u00f3n del ingreso al drenaje de crudo y evacuaci\u00f3n de agua<\/strong>.<\/p>\n<p>Al momento, los trabajos en el tramo de la tuber\u00eda finalizaron, al igual que las labores de prueba hidrost\u00e1tica que fueron ejecutadas por el personal t\u00e9cnico de EP Petroecuador, con resultados satisfactorios, cumpliendo de esta manera con los procedimientos y las normas t\u00e9cnicas aplicables en estas actividades.<\/p>\n<p>&nbsp;<\/p>\n<h6><strong><img decoding=\"async\" loading=\"lazy\" class=\"aligncenter wp-image-10229\" src=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/03\/Variantes-SOTE-5-scaled.jpg\" alt=\"\" width=\"750\" height=\"1390\" srcset=\"https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/03\/Variantes-SOTE-5-scaled.jpg 1381w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/03\/Variantes-SOTE-5-162x300.jpg 162w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/03\/Variantes-SOTE-5-552x1024.jpg 552w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/03\/Variantes-SOTE-5-768x1424.jpg 768w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/03\/Variantes-SOTE-5-829x1536.jpg 829w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/03\/Variantes-SOTE-5-1105x2048.jpg 1105w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/03\/Variantes-SOTE-5-13x24.jpg 13w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/03\/Variantes-SOTE-5-19x36.jpg 19w, https:\/\/www.eppetroecuador.ec\/wp-content\/uploads\/2021\/03\/Variantes-SOTE-5-26x48.jpg 26w\" sizes=\"(max-width: 750px) 100vw, 750px\" \/><\/strong><\/h6>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p class=\"excerpt\">Quito, 31 de marzo de 2021 Para estos trabajos, la empresa p\u00fablica ha invertido USD 10,5 millones en la construcci\u00f3n de seis variantes y un by pass del oleoducto. Este 1 de abril, la Empresa P\u00fablica Petroecuador paralizar\u00e1 las operaciones de bombeo del Sistema de Oleoducto Transecuatoriano (SOTE) por un lapso estimado de 24 horas a partir de las 00h00,&hellip; <a href=\"https:\/\/www.eppetroecuador.ec\/?p=10227\">Read more &rarr;<\/a><\/p>\n","protected":false},"author":5,"featured_media":8387,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[5,6],"tags":[],"_links":{"self":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/10227"}],"collection":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=10227"}],"version-history":[{"count":4,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/10227\/revisions"}],"predecessor-version":[{"id":10232,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/posts\/10227\/revisions\/10232"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=\/wp\/v2\/media\/8387"}],"wp:attachment":[{"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=10227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=10227"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.eppetroecuador.ec\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=10227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}